SOLD! Call Ellen Otey (804) 241-4314 TO SELL YOURS!
Featured Listing
$208,750
Square Feet: 1,144
Beds: 3
Baths: 2 full
Property Type: Residential
This home is under construction-This is a sample picture of the home being built. The Mason Plan features 3 bedrooms and 2 full baths with an open floor plan. Scheduled to be completed August 2020. Closing Costs assistance available.
Call Ellen Otey, 804-241-4314 for more information!
Property Type: Residential | Water Heater: Electric | Basement: No |
Year Built: 2020 | Cooling: Central Air | Subdivision: None |
Lot Size: 1.4 acres | Heating: Heat Pump | Roof Type: Shingled |
Location
5889 W. River Road, Aylett, VA 23009
Address
5889 W. River Road
Aylett, VA 23009
Listing Agent
